Chennai, Tamil Nadu 3-5 Yrs ₹04 - ₹06 Yearly
Job Description
AREAS OF RESPONSIBILITY
(Describe the nature, scope, level of improvements to new
ideas, etc.)
LEVEL
*(Full, Partial, Supportive)
MEASUREMENT
(Quantitative or quality criteria to achieve responsibility)
Industrial Efficiency through continual improvements
Identify process related issues through SIM meetings; study
the down time trends. Define problem areas and identify root cause.
Propose solutions to eliminate the root cause; implement and evaluate
effectiveness. Update process documents by incorporating the changes.
Continually look for ways and means of improving productivity. Implement idea
schemes within defined area of work. Maintain & Update MTM dataon continual
basis, revisit in case of process changes on yearly basis
Full
Industrial efficiency,
DLP
Capacity realization
Launching of new product
Receive the documents from industrial team for all new
projects. Study, evaluate and identify improvement points if any;
Incorporate them before launch of the product
Full
Product Launch report
Qualification of Benches
Study the basic machine design. Study the performance of the
machine by producing a minimum of entire range on that particular machine.
Validate the products produced with the support of quality. Study the time
taken for production; Qualify the machine based on the results of the above
study and tenderizing the historical quality level data of same/similar product
Full
Benches report
Conducting LIS
Conduct Line short run on the qualified machines to find the
areas of improvements if any. Based on identified areas of improvement take
corrective / preventive action, Implement the same as part of the system.
Declare the suitability of lines and make them available for production
Full
Appropriate line suitability
Troubleshooting / Problem Solving on a daily basis
On a daily basis get to know quality issues, inadvertent
breakdowns/ down time like change over & adjustments, safety &
ergonomic related issues in the lines. Understand the problem and suggest
alternative solution to immediately address the problem and regain production.
Discuss with other product lines if required to identify and implement
possible solutions; Work towards providing long term solutions to
arrest the reoccurrence of the problem
Full
Capacity Realization